Continued installation of various components:
-- Riveted in the slide tube guide for the aileron trim servo.
-- Riveted in the attach bracket for the autopilot roll servo.
-- Measured for the fuel lines, fuel vent lines, and brake lines.
-- Planned for the wiring routes through the bulkheads and wing spar.
-- Re-installed the flap motor and actuator arm/blocks. Complied with Van's Service Bulletin (drilled and safety-wired the flap motor shaft.) [Superseded]